Home ProductsDC EV Charger

50Hz AC380V DC EV Chargers Air Cooling Public DC Fast Charger

Certification
China Sichuan Hongshunjin Trading Co., Ltd. certification
China Sichuan Hongshunjin Trading Co., Ltd. certification
I'm Online Chat Now

50Hz AC380V DC EV Chargers Air Cooling Public DC Fast Charger

50Hz AC380V DC EV Chargers Air Cooling Public DC Fast Charger
50Hz AC380V DC EV Chargers Air Cooling Public DC Fast Charger 50Hz AC380V DC EV Chargers Air Cooling Public DC Fast Charger 50Hz AC380V DC EV Chargers Air Cooling Public DC Fast Charger 50Hz AC380V DC EV Chargers Air Cooling Public DC Fast Charger

Large Image :  50Hz AC380V DC EV Chargers Air Cooling Public DC Fast Charger

Product Details:
Place of Origin: Sichuan, China
Brand Name: Hongshunjin
Certification: CE
Model Number: HY-ZY1-80
Payment & Shipping Terms:
Minimum Order Quantity: 1
Price: $4,588.23-$5,294.11
Packaging Details: Packing A: 1). 2 yellow straps 2). Shrink wrap surrounding the entire box 3). Specially for the express delivery Packing B: 1). Box + mater carto
Delivery Time: 10-60 work days
Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability: 100 pieces Per week

50Hz AC380V DC EV Chargers Air Cooling Public DC Fast Charger

Description
Machine Output Power: 80KW Input Voltage: AC380V±15%
AC Input Frequency: 50Hz Output Voltage: 200~750VDC
The Maximum Output Current Of The Whole Machine: 200A Maximum Output Current Of Single Gun: 200A
High Light:

DC EV Chargers Air Cooling

,

Fast DC Charger AC380V

,

50Hz public dc fast charger

 

80KW Fast DC Charger AC380V±15% 50Hz IP54 Air Cooling APP WIFI For Public

 

Why choose Hongshunjin?


OCA Member
OCPP 1.6J full profiles implemented including smartchargingOCPP2.0 upgradable
Safety Design
Electric protections including over current,short circuit,over voltage,under voltage
groundfault,lightning surgeover temperature
Current Leakage Protection
30mAAC&6mA DC or Type-B RCCB
PME Earth Fault Monitoring
All the chargers have been designed to meet and comply with wiring regulations
BS7671:2018includingamendment1:2020 in UK
Multiple Earthing Schemes Compliant
Supporting various installations such asITTN-STN-C and TN-C-S LCD Display
2.8'&7'LCD display for excellent experience
Professional Web Configuration
OCPP server,Internet connection,Max current output and
other system configuration onwebpage via PCPAD and Mobile phone
Load Balancing
Dynamically distributing the output power in a system with other devices, depending
on theavailable power
Phase Rotation
Dynamic phase balancing which allows our system to handle both onephase andthree-phase charging simultaneously, thereby optimizing the use of all available power,whilepreventing grid imbalance.

 

technical parameter

 

technical parameter
Model HY-ZY1-80
Machine output power 80KW 120KW 160KW
Input voltage AC380V±15%
AC input frequency 50Hz
Output voltage 200~750VDC
The maximum output current of the whole machine 200A 300A 400A
Maximum output current of single gun 200A 250A 250A
Single module rated power constant power 20KW
Number of module configurations 4 6 8
Power factor ≥0.98
Efficiency ≥95%
Power distribution mode any full power for single gun / dual power distribution at the same time
Communication Interface Charging gun cable length 5 meters (customizable length)
Metrology class 0.5
Protection class IP54
Cooling method Air cooling (rear air)
Working environment temperature -25℃~55℃
Noise ≤60dB
Weight ≤180KG (without module)
Cabinet size(mm) 625(W)*800(D)*1750(H)

 

50Hz AC380V DC EV Chargers Air Cooling Public DC Fast Charger 050Hz AC380V DC EV Chargers Air Cooling Public DC Fast Charger 150Hz AC380V DC EV Chargers Air Cooling Public DC Fast Charger 250Hz AC380V DC EV Chargers Air Cooling Public DC Fast Charger 3

 

Here are some customer’s common questions about our products

 

Q1:Are you Trading Company or manufacturer?

A: We are professional design and manufacturer, our factory has been established for 7 years.

 

Q2:What are your main market?

A:Mostly Europe and America, then Asia.

 

Q3:How long time to make a sample?

A:3-7 days if we make a new sample for you.

If you just select our existing sample, we can send you sample the next day.

 

Q4:How long is the lead time:

A: The lead time is 7-30 days, it depends on the quantity and production scheduling.

 

Q5: How many kinds of payment?

A: We have T/T and L/C etc.

If you need the detailed terms of payment, pls contact us.

 

Q6: Why is new model expensive than other old models?

A: A new model needs large R&D and mould cost, and the depletion rate is bigger during mould and production. Besides, new model is low productive but labor costs keep same as old model.

 

Q7: What certifications do you have?

A: We have approved Chinese national standard, European IEC standard, American SAE standard and Japanese CHAdeMo standard etc certification.

 

Q8: How long is the warranty time?

A: The warranty time is 2 years.

 

Our Service

1. We will reply you for your inquiry in 24 hours.

2. T/T and L/C etc payment terms all accepted.

3. Shipment:By air,By sea,By International express (DHL,Fedex,).

4. Guarantee Period: Within 24 months after shipment.

5. Provide operating guide (instruction).

6. Customized design,sample and packing according to clients requirements.

Contact Details
Sichuan Hongshunjin Trading Co., Ltd.

Contact Person: admin

Tel: +8619136355221

Send your inquiry directly to us (0 / 3000)